Ten trades, in-house
Engineering
City, County, & TXDOT Approval
Site development, drainage, and new building permits with Harris County and the City of Houston.
Tenant-level inspections below.
General Contracting
One contract, one contact.
Civil
Site Work / Paving
Horizontal groundwork.
Clearing, grading, drainage and detention, underground utilities, right of way and driveway work, plus paving and site concrete.
Structural
Concrete
Foundation: piers, grade beams, and the slab floor. Anchor bolts placed to the millimeter.
Building Erection
Weld-up onsite fab for custom projects, or PEMB bolt-up for scale.
MEP
Mechanical
Heating and cooling: rooftop units, ductwork, controls, startup.
Electrical
Service, switchgear, feeders, wiring, fire alarm, 3-phase main upgrade, Centerpoint ESR.
Plumbing
Underground connections and stub outs coordinated with concrete foundation placement.
Finishes
Interior Build-Out
Framing, drywall, doors, and tenant finishes.
Operations, Lease-Out & Sale
Revenue begins.
Tenant permits
Build-Out Permits
Build-out permitting and Certificate of Compliance (COC) support to get your business ready to open.
Operational Permits
Required by the Harris County Fire Marshal annually.
Place of assembly, special events, high-pile storage, compressed gas (yeah bars, they're talking about you).
Just need materials?
Montenegro has infiltrated the supplier.
Go right to the source:
Metal Building Supply
Custom pre-engineered metal building design and supply.
Concrete Supply
Ready-mix concrete delivered to spec, priced through our direct batch plant relationship.
Your scope. Our Control.
It’s the little things.
Let's cook.